Risk Rating of Precast Concrete Pile Fabrication Process: A Case Study in Bandung, Indonesia

Show simple item record

dc.contributor.author Firdaus, Adrian
dc.contributor.author Adianto, Yohanes Lim Dwi
dc.contributor.author Wijaya, Kevin Cornelius
dc.date.accessioned 2019-11-01T03:23:42Z
dc.date.available 2019-11-01T03:23:42Z
dc.date.issued 2019
dc.identifier.issn 2672-9156
dc.identifier.other artsc444
dc.identifier.uri http://hdl.handle.net/123456789/9475
dc.description APPLIED SCIENCE AND ENGINEERING PROGRESS; Vol.12 No.2, 2019. p. 133-139. en_US
dc.description.abstract The utilization of precast concrete pile has become prevalent in Indonesian construction industry. The business process within the fabricator of precast concrete pile includes fabrication and installation process. This study is intended to fill research gap in fabrication process since most of the risk studies focus on the installation process. This study is aimed to identify and rate all risks related to the precast concrete pile fabrication process, followed by a recommendation of mitigation strategy. The preliminary risks are identified through field observation to a precast concrete pile fabricator in Bandung, Indonesia. The preliminary risks are validated using Delphi technique, resulting 22 final risk factors. The final risk factors are rated using risk matrix method. The high and medium category of the rated risks are sling failure; bar-cutter and/or bar-bender machine failure; hoist crane failure; and pile chip defect. Since most of those risks occur on the respective machine, the general mitigation strategies are to provide a backup machine and the frequent monitoring and maintenance. Besides, an adequate standard operation procedure of each fabrication stages needs to be established and its implementation should be monitored carefully. en_US
dc.description.uri http://ojs.kmutnb.ac.th/index.php/ijst/issue/view/137
dc.language.iso en en_US
dc.publisher King Mongkut’s University of Technology North Bangkok en_US
dc.relation.ispartofseries APPLIED SCIENCE AND ENGINEERING PROGRESS;Vol.12 No.2, 2019.
dc.subject FABRICATION en_US
dc.subject RISK RATING en_US
dc.subject PRECAST CONCRETE PILE en_US
dc.title Risk Rating of Precast Concrete Pile Fabrication Process: A Case Study in Bandung, Indonesia en_US
dc.type Journal Articles en_US