The Risk Rating of Delay Risk Factor of Road Construction Project in Papua

Show simple item record

dc.contributor.author Firdaus, Adrian
dc.contributor.author Setiawan, Theresita Herni
dc.contributor.author Sitepu, Evraim L.
dc.date.accessioned 2018-05-08T07:00:21Z
dc.date.available 2018-05-08T07:00:21Z
dc.date.issued 2017
dc.identifier.issn 1823-7843
dc.identifier.other artsc281
dc.identifier.uri http://hdl.handle.net/123456789/5913
dc.description MALAYSIAN JOURNAL OF CIVIL ENGINEERING; Vol.29 No.3, 2017 en_US
dc.description.abstract Papua Province is one of the target areas of national development program in Indonesia. The development program covers the acceleration of road construction. The issue regarding this acceleration is the frequent occurrence of delay in the road construction project in Papua. This research delivers the risk rating of delay risk factors of road construction project in Papua. The delay risk factors are grouped into project factors; owner; contractor; consultant; design; materials; equipment; labor; external factor; finance and economic; and finance and political factors. Nine risks with high categories are generated from the risk assessment, which are (1) Social and Cultural Effect; (2) Physical factors in the working field; (3) Traffic obstruction within and around the project area; (4) Public security; (5) Ineffective delay penalties; (6) A poor relationship with local communities; (7) Lack of productivity; (8) Change-order by owner during construction; and (9) Delay in revising designs by owner. The risks with high category should be mitigated by performing several methods since the early stage of the project. The methods include conducting public discussion, performing comprehensive field survey, performing adequate cost estimation, preparing a sufficient contract, and executing a proper site supervision system. en_US
dc.description.uri http://civil.utm.my/mjce/volume-29-issue-3-2017/
dc.language.iso en en_US
dc.publisher Universiti Teknologi Malaysia en_US
dc.relation.ispartofseries MALAYSIAN JOURNAL OF CIVIL ENGINEERING;Vol.29 No.3, 2017
dc.subject ROAD CONSTRUCTION en_US
dc.subject RISK RATING en_US
dc.subject DELAY RISK FACTOR en_US
dc.title The Risk Rating of Delay Risk Factor of Road Construction Project in Papua en_US
dc.type Journal Articles en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search UNPAR-IR


Advanced Search

Browse

My Account