Abstract:
A retention pond with total volume of 80,000 m3 and total area of 1.5 ha was
constructed within a residential area in Bandar Lampung in order to protect the
area from inundation during high intensity of rainfall. On 24 January 2013 the
embankment of pond was found collapsing and caused about 1 m inundation at
downstream. This study is aimed at evaluating the reliability of available retention
pond to control runoff that flows into it. HEC-HMS model is employed here to
simulate the events. Based on the simulation results, it is found that the existing
retention pond is able to control the 5 years flood. Another retention pond is
necessary to be built at the upstream in case higher return period is considered.
Otherwise, outlet with diameter 1 or 1.5 m must be installed to lower the water level
within the pond. Moreover, a combination of new retention pond (432,000 m3) and
two culverts with diameter 1 m may increase the capability of available retention
pond to cope with 100 years rainfall. To prevent inundation occurs at downstream,
construction of dike or normalization is therefore crucial.
Description:
Makalah dipresentasikan pada The 4th International Seminar of HATHI on "Water Related Disaster Solutions". Himpunan Ahli Teknik Hidraulik Indonesia (HATHI). Yogyakarta, Indonesia, September 6th - 8th 2013.