Abstract:
Variety of methods have been proposed over decades in order to estimate pile group settlement. Due to the development of numerical tools, modelling settlement of pile group is no longer limited to the column load and pile geometry but also can be expanded to consider the effect of construction activities such as fill and excavation and non-horizontal surface geometry which affects initial stress prior to settlement analysis. In this paper, numerical simulation carried by using MIDAS GTS NX is conducted in order to evaluate the effect of construction activities and non-horizontal surface geometry to the settlement analysis.
Description:
Makalah dipresentasikan pada 26th Annual National Conference on Geotechnical Engineering "Geotechnical Engineering to Support Sustainable Infrastructure Development from Theory to Practice". Himpunan Ahli Teknik Tanah Indonesia. Jakarta, 8-9 November 2022. p. 113-120.