Optimization of Reservoir Operation Using Linear Program, Case Study of Riam Jerawi Reservoir, Indonesia

Show simple item record

dc.contributor.author Ginting, Bobby Minola
dc.contributor.author Harlan, Dhemi
dc.contributor.author Taufik, Ahmad
dc.contributor.author Ginting, Herli
dc.date.accessioned 2020-08-28T07:12:00Z
dc.date.available 2020-08-28T07:12:00Z
dc.date.issued 2017
dc.identifier.issn 1814-2060
dc.identifier.other artsc487
dc.identifier.uri http://hdl.handle.net/123456789/11151
dc.description INTERNATIONAL JOURNAL OF RIVER BASIN MANAGEMENT; Vol.15 No.2 2017. p. 187-198. en_US
dc.description.abstract The pattern of water use operation is important to ensure the continuity of water supply system of a reservoir. This pattern, which is usually called power rule curve in a hydropower system, should be optimally obtained, so that the yielded electrical power also becomes optimal while the continuity of reservoir storage can also be tenable. In this study, in order to satisfy the main objective of Riam Jerawi Reservoir, where the energy of 6 MW should be provided every month, a linear optimization model is applied for three objective functions such as maximizing total energy, maximizing minimum energy and minimizing energy shortage. In addition, a simulation model is also presented for comparison purpose particularly to emphasize some disadvantages of using this model. The results show that the optimum energy can be achieved by applying this optimization model where the continuity of reservoir volume is also satisfied. Meanwhile, the simulation model produces the rule curve, which cannot satisfy the continuity criterion. This optimization model is expected to be applied for other similar cases and give the optimum power rule curve for the related stakeholders. en_US
dc.language.iso en en_US
dc.publisher Taylor & Francis en_US
dc.subject OPTIMIZATION MODEL en_US
dc.subject LINEAR PROGRAM en_US
dc.subject OBJECTIVE FUNCTIONS en_US
dc.subject POWER RULE CURVE en_US
dc.title Optimization of Reservoir Operation Using Linear Program, Case Study of Riam Jerawi Reservoir, Indonesia en_US
dc.type Journal Articles en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search UNPAR-IR


Advanced Search

Browse

My Account